A quick heads-up: when people picture the house lifting process, they picture jacks and a house going up. That’s one stage out of eight. Honestly, the planning and the new foundation take more thought than the lift itself.

What Is House Lifting?

It’s raising an existing building to a higher level without knocking it down. The structure gets separated from its old base at plinth level, goes up on jacks, and is set down on a new or strengthened foundation. That’s the house lifting process in one line; the rest of this guide fills in the detail.

The reasons vary. A road that’s been relaid one time too many. Water in the house every July. Sometimes the plinth was just built too low, and sometimes the family wants a parking floor underneath.

We use one method only at Home Lifting India: Manual Screw Jack Technology. Civil engineer Naveen Singh started the company, and we work out of a head office in Thane, Maharashtra and a branch in Nilokheri, Haryana.

Is Your House Suitable for Lifting?

Lots of houses can be lifted. Not all. And that answer has to come from someone standing in front of your house, not from a phone call.

On the site visit, we look at:

  • load-bearing walls or an RCC frame?
  • the walls, columns, beams and old foundation, and how they’re holding up
  • cracks, a tilt, or signs that one side has already gone down
  • the soil, and where the water drains
  • the number of floors and total built-up area
  • how much room there is to work between you and the neighbours

Government guidance says much the same. In 2025, the Building Materials and Technology Promotion Council (BMTPC), under the Ministry of Housing and Urban Affairs, issued a Performance Appraisal Certificate for a screw-jack building lifting technique. It says a competent structural engineer must check the building before lifting, and the work must be done by trained people under qualified engineers.

It also lists where lifting isn’t done: marshy land, buildings right next to drains, sewers or ponds, places with high-voltage lines overhead, RCC slabs that leak, and houses with stone-tile roofs on joists instead of an RCC roof. Catching exactly those things is the whole point of the assessment at the start of the house lifting process.

Do you need permission?

That one’s local. Check with your municipal corporation or panchayat before anything starts. In Kerala, for example, raising a building counts as an alteration under the building rules, so you need a permit from the local body plus a structural stability certificate from a licensed structural engineer (Onmanorama). Other states and cities have their own rules.

When Should You Start the House Lifting Process?

Earlier than you’d think.

Water came in this monsoon? Heard the road’s due for another resurfacing? New cracks keep showing up near the doors and windows? Then get the house assessed now.

There’s a practical reason. Concrete for the new base needs dry weather to cure, and nobody wants to be digging along the plinth in July. Book the assessment in the dry months and the house can be up before the rains are back.

The House Lifting Process, Step by Step

If you’ve ever wondered how house lifting is done on an actual site, this is it, in order.

1. Photos and a first call

Our house lifting process usually starts on WhatsApp. A few photos are enough to begin: the house, the road, the entrance. Mention which city you’re in and how many floors the house has, plus a rough idea of the extra height you’re after. We’ll tell you if lifting looks sensible and what the next step is.

2. Site inspection

Then our team comes over. They measure the building, record the road level against your plinth, and look hard at how the house is built and what shape it’s in. They’ll check the lane too. Jacks, supports and material all need a way in and out.

3. Structural assessment and the lifting plan

Now the engineers decide two things: can this building be lifted, and if so, how? Final height, where every jack goes, the order of work, what the new base will look like. This is also where the house lifting process gets a price: you get the quotation, worked out on the built-up area of all floors and the lifting height.

4. Preparing the house

Before anything goes up, the house is prepared at plinth level so its weight can move safely onto the jacks. Earth along the walls gets dug out where needed. Water, drainage and electric lines passing through the plinth are disconnected or adjusted, ready to be joined back at the new level.

5. Jacks in place

Manual screw jacks go in at the planned points, spaced so the load is shared evenly. Once a screw jack is turned, it holds its position mechanically. It doesn’t rely on hydraulic pressure to keep your house where it is. (How many jacks, and why screw rather than hydraulic? See house lifting by jack.)

Multi-storey building lifted on manual screw jacks over a steel track, a key stage of the house lifting process and of house shifting
Every jack sits at a planned point, so each wall carries its share.

6. Controlled lifting

This is the part of the house lifting process everyone imagines, and it’s slower than you’d expect. Each jack gets a small turn, then the next one, then the next, in a fixed order. Levels are checked constantly. As the house creeps up, the crew stacks temporary supports underneath it.

Uneven lifting is what cracks walls. So nobody hurries this part.

House raised on manual screw jacks and brick supports by Home Lifting India, a house lifting company led by civil engineers
The temporary supports go up along with the house.

7. New base and plinth

When the house reaches its planned height, the gap underneath becomes a new plinth, or a new foundation goes in where the plan needs one. A weak old foundation gets foundation strengthening now, while there’s access. Then the weight moves off the jacks and onto the permanent base.

Diagram: manual screw jacks on bearing pads temporarily supporting a building, the same setup used in house lifting by jack and foundation work
If the foundation needs work, the jacks carry the house while it's done.

8. Final checks and handover

Last of all, the levels are measured once more, the steps and entrance are rebuilt for the new height, services get reconnected and the finishing is done. Then we walk around the house with you, and that’s the end of the house lifting process.

How to Prepare Your Home for the House Lifting Process

There isn’t much for you to do during the house lifting process. A few things help, though:

  • Keep the built-up area of each floor handy (the house plan or property papers will have it).
  • Clear the space around the house so the team can dig along the plinth.
  • Move fragile stuff, and anything stacked against the outside walls, somewhere safe.
  • Have a word with the neighbours. If you share a wall, definitely.
  • Find out early whether the family needs to stay at a relative’s place for the lifting days.
  • Note where your water, drainage and electric lines run. They’ll be reconnected at the new level.

Is the House Lifting Process Safe?

It can be, if it’s planned and done properly. The risk comes down to the building’s condition, the soil, how many jacks there are and where, the lifting order, and the experience of the people turning them.

That’s why the assessment comes first, why the lift happens in small steps, and why someone watches the levels the whole way up. Any contractor who promises you zero risk before seeing your house isn’t being straight with you.

“I had a 40-year-old ancestral house that needed lifting due to road level rise. Naveen Sir’s team used Manual Screw Jack Technology and lifted it 3 feet without a single crack.”

Suresh Patel, Ahmedabad
Multi-storey building lifted on manual screw jacks; its total built-up area decides the house lifting cost
Someone is always checking levels while a building goes up.

How Long Does the House Lifting Process Take?

No single answer. Size, floors, lifting height, foundation work and the site all change it. You’ll get a timeline after the site inspection, and a good contractor sticks to it.

“Naveen Sir answered every question on WhatsApp with photos and videos. The team completed our temple lifting in exactly 25 days as quoted.”

Ramesh Yadav, Patna

8 Questions to Ask Any House Lifting Contractor

Whoever you end up hiring, ask these before the house lifting process starts. A decent team won’t mind.

  1. Which lifting method will you use, and why does it suit my house?
  2. Who checks the structure before work starts?
  3. How many jacks, and where?
  4. How will you watch the levels during the lift, and how often?
  5. What’s actually in the quote, and what isn’t? (Plinth? Flooring? Who reconnects the plumbing?)
  6. How many days, roughly? And what tends to slow things down?
  7. If a crack appears, who fixes it?
  8. Can I see photos or videos of similar jobs, or talk to a past client?

What Decides the Cost of the House Lifting Process?

Mainly the total built-up area of all floors and the lifting height. Construction type, the state of the foundation and how easy the site is to reach play a part too. Extras like plinth filling, new flooring, steps or a parking floor underneath are planned around what you want and listed separately in the quote.

For a rough figure, try the house lifting cost calculator. If your real worry is a road that’s climbed above the house, our guide on a house below road level compares every option, and our house lifting services in India page explains what we do.

Want to Know How the House Lifting Process Would Work for Your Home?

Send four or five photos, your location and the number of floors. We’ll tell you whether lifting suits your house, and what happens next.

Questions We Get Asked

The building is cut free from its old base at plinth level, raised on jacks in small steps with the levels checked throughout, and set down on a new plinth or foundation. Every house lifting process we run starts with a site inspection and a structural assessment.

Depends on the building and the stage of work, so ask us during the assessment. The engineer decides what’s safe at each stage, especially while the house is actually going up.

Often, yes, but it’s a local matter. Kerala, for instance, asks for a local-body permit and a stability certificate signed by a licensed structural engineer. Your municipal corporation or panchayat can tell you what applies to you.

It shouldn’t, if the building is suitable and the lift is even. Cracks usually come from rushed or uneven lifting, which is exactly why the jacks go a little at a time and the levels are checked all the way. Any cracks that are already there get noted during the inspection.

Often, yes, but only after a proper check. Old houses need a slow, even lift, which is what screw jacks give you. If the structure isn’t up to it, we’ll tell you.

We decide that for each house after the assessment, based on the road or flood level, any space you want underneath, and what the structure can safely take.

सबसे पहले इंजीनियर साइट पर आकर मकान और उसकी नींव की जांच करते हैं। फिर प्लिंथ लेवल पर मैनुअल स्क्रू जैक लगाकर पूरे मकान को थोड़ा-थोड़ा करके बराबर ऊपर उठाया जाता है, और हर कदम पर लेवल चेक होता है। तय ऊंचाई पर पहुँचने के बाद नीचे नया प्लिंथ या नींव बनाई जाती है और मकान उस पर टिका दिया जाता है। अपने घर की फ़ोटो WhatsApp पर भेजिए, हम बताएंगे कि आपके मकान के लिए क्या सही रहेगा।

Planning to lift your house? Talk to us first.

Scroll to Top