House Shifting Without Demolition

Sometimes the problem isn’t height. It’s position. Maybe a notice has come from the municipality: the road is being widened and the front of your house is now “inside the line”. Or the house was built hugging the boundary wall. Or it sits on that one low corner of the plot where every bit of rainwater ends up. House shifting moves the whole building to a better spot, without breaking it down.

Quick clarification, since people mix this up all the time: we don’t mean packers and movers. We mean the building itself moves. Home Lifting India lifts the house on manual screw jacks, moves it along a temporary track, and sets it down on a new foundation that’s already built and waiting.

Every house shifting job is planned by our engineers. Naveen Singh, who started the company, is a civil engineer, and nothing gets moved until the structure has been checked.

What movesYour whole building, to a new position on your plot
MethodScrew jack lifting + controlled horizontal movement
Starts withSite survey & structural assessment
Service areaPan-India · Thane & Nilokheri offices
Multi-storey building lifted on manual screw jacks over a steel track, a key stage of the house lifting process and of house shifting
For house shifting, the building first goes up on screw jacks, then moves along a planned track.

When Do People Need House Shifting?

Road widening is the big one. Part of the building falls inside the new road line, and the choice is to break that part or move the house back.

Then you get boundary trouble, where the setback rules say the house should be further in. A few people just want room: for a proper gate, a car, maybe a second house later. Others want to get away from a nala or the low, flood-prone corner of the plot. And sometimes the structure is simply too good to knock down.

How House Shifting Works

  1. Survey. We measure the building and the plot and mark where it’s going.
  2. Structural check. Engineers confirm the building can be lifted and moved safely.
  3. New foundation first. The base at the new spot is built in advance, to the plan.
  4. Separate and lift. The building is cut free from its old foundation at plinth level and raised on manual screw jacks.
  5. Track and supports. A temporary track and support system goes in between the old spot and the new one.
  6. The move. The building travels slowly along that path, with alignment and levels checked the whole way.
  7. Set down. It’s lowered and fixed onto the new foundation.
  8. Final check. Structure, levels and finishing are gone over before handover.
Workers setting manual screw jacks under a house before it is lifted
Lifting always comes first. The house is separated at plinth level and raised on jacks before it moves an inch.

What Our Engineers Check First

Before any house shifting goes ahead, they want to understand the building properly. How is it built? How big and heavy is it? Are the walls, columns and foundation in decent shape? Then the ground, both along the path and at the new spot. How far does it go, which way, and is anything in the way? The water pipe, the drain and the electric line all have to be cut and joined again later, so we sort that out on paper first.

Shifting always depends on a structural assessment and on what the site allows. If it doesn’t suit your building, we’ll say so and walk you through the alternatives.

Road Widening? Read This First

This is the most common reason people call us about house shifting. If you’ve had a notice, a few things help:

  • Get the new line marked exactly, so you know how far back the building has to go and how much free plot there is behind it.
  • Don’t wait for the deadline. Surveys and a new foundation don’t happen in a week.
  • Get the building looked at. If it’s solid, great. If some part is weak, it may need fixing before it moves.
  • Think about services early. Your water, drain and power connections will be off for part of the work.
House before shifting – standing at the road edge in the path of road widening
Before: the road widening line cuts right through the front of the house.
Same house after shifting – moved back from the road without demolition
After house shifting: same house, now set well back from the road.

These two are illustrations, not photos from a real job.

Why People Trust Us With House Shifting

Lifting and moving buildings is our work. There’s nothing else on the side. Every move starts with manual screw jacks, which raise the building slowly and evenly before it goes anywhere.

Naveen Singh, a civil engineer, founded the company and still guides the team, and we have 20+ years and 5000+ projects behind us. The head office is in Thane, Maharashtra, there’s a branch in Nilokheri near Karnal in Haryana, and we work all over India. You get the quotation after a proper site survey.

Related Services

Need the house to face another way instead of moving it? That’s building rotation. Want it higher at the same time? See house lifting services and building lifting. Or have a look at all our services.

House Shifting FAQs

It’s the method of lifting a building off its old foundation and moving it, slowly and under control, onto a new one. Nothing is demolished. We use manual screw jacks for the lifting part.

No. Packers and movers shift your furniture. We shift the house.

Often, yes. It depends on how much space your plot has behind the house, the condition of the building and a structural check.

In many cases both happen together, for example by setting the house on a new foundation at a higher level. We decide that after the assessment.

There’s no fixed distance. The space on the plot, the building’s size and condition, the ground along the way and the new foundation all decide it. We’ll tell you what’s possible after the survey.

No fixed rate. It depends on the built-up area, the number of floors, how far it moves, the foundation at the new spot and the site. Send the details and some photos for a proper quote.

हाँ, कई बार। सड़क चौड़ी होने पर मकान तोड़ने के बजाय उसे मैनुअल स्क्रू जैक से उठाकर, ट्रैक पर धीरे-धीरे पीछे खिसकाया जाता है और पहले से बनी नई नींव पर रख दिया जाता है। ये प्लॉट में खाली जगह और स्ट्रक्चर की जांच पर निर्भर करता है।

For a rough idea of the cost, try the house lifting cost calculator.

Get a Free House Shifting Quote

Tell us your location, the size of the building, the number of floors and where on the plot it needs to go. A few photos on WhatsApp is the fastest way to start.

Scroll to Top